Discusses the reasons and solutions for the low pass rate of one-step forming of V-shaped column concrete construction.Through the comprehensive analysis of relevant literature and field investigation,it is found that the main reasons include nonstandard opera-tion,substandard material quality and unreasonable technological process in the construction process.In order to solve these problems,a se-ries of solutions are put forward,including strengthening the skills training of construction personnel,establishing quality monitoring system and optimizing technological process.By implementing these measures,the qualified rate of V-shaped column concrete construction can be im-proved,the engineering quality can be improved,and the cost can be reduced,which can provide useful reference for the development of related industries.
V-shaped columnconcreteprocess flowmonitoring system