首页|复杂地质区域铁路建设技术难点与处理措施研究

复杂地质区域铁路建设技术难点与处理措施研究

Handling Measures of Comprehensive Technical Challenges in Railway Construction in Complex Geological Areas

扫码查看
本文以文山至靖西铁路为研究基础,对复杂地质区域铁路建设的综合性技术难题进行分析和总结.文山至靖西铁路地跨滇东南及桂西地区,是我国喀斯特地貌最为集中的地区之一.该项目自然特征对设计和投资均提出较高要求.本文从项目选线、坡度适应性、桥隧路工程设计、投资合理性等方面进行总结.研究成果可为类似项目提供借鉴与参考.
With Wenshan-Jingxi Railway as a case for study,this paper reviewed the comprehensive technical challenges encountered in railway construction within complex geological areas.Wenshan-Jingxi Railway spans across the southeastern Yunnan and western Guangxi,which is known as one of the most concentrated areas of karst landforms in China.Given the project's distinct natural characteristics,it poses heightened requirements for specific design work and ultimate investment control.The study encompassed multiple aspects including route selection,gradient adaptability,bridge,tunnel,and railway engineering design,as well as the rationality of investment.The study outcomes offer theoretical knowledge and practical application references for future analogous infrastructure development projects.

comprehensive technical challengescomplex geologygradient adaptability

马同刚

展开 >

云南省综合交通发展中心,昆明 650031

综合性技术难题 复杂地质 坡度适应性

2024

高速铁路技术
中国中铁二院工程集团有限责任公司

高速铁路技术

影响因子:0.398
ISSN:1674-8247
年,卷(期):2024.15(3)
  • 9