The remaining slag-double slag operation was adopted to carry out practical industrial experiment in 120 t converter in a steel-making plant.The production data were analyzed and compared with the data obtained from the original remaining slag-single slag process.The results showed that when w(P) in hot metal was 0.12 %,w(C) at TSC time of the new process was 0.45 % and w(P) could be reduced to 0.023 %.The dephosphorization rate was 81.45 % which was higher than the dephosphorization rate of the original process 78.86 %.w(C) in the molten steel at the smelting endpoint was 0.12 % and w(P) could be reduced to 0.013 %.The dephosphorization rate was 89.52 % which was close to the dephosphorization rate of the original process.The apparent metal material consumption was reduced by 5 kg/t,but the production cycle was prolonged by about 5 minutes.