依托某大型深基坑工程,通过自动化监测和数值模拟,研究采用钢换撑支撑体系的狭长形深基坑在开挖过程中基坑支撑围护体系变形特性、受力特点及周边地表沉降变化趋势.该文采用Midas GTS建立基坑模型,分别针对有钢换撑断面及无钢换撑断面,探讨钢支撑水平间距、第3道钢支撑距基坑底距离、钢支撑预加轴力及基坑围护桩桩径的变化对围护桩结构变形与受力及周边地表沉降的影响.结果表明:① 不同钢支撑水平间距对围护结构变形及周边地表沉降控制效果不同,钢支撑水平间距越小,基坑桩体位移、桩身弯矩、地表沉降值越小;② 第3道钢支撑的位置对基坑稳定性影响不大;③ 通过施加钢支撑预加力,可以有效控制基坑围护桩体变形及周边地表沉降值;④ 随着围护桩桩径的增大,围护结构变形及地表沉降值均有所减小,但超出某一桩径时,基坑变形及周边地表变形对围护桩桩径的敏感性将减弱;⑤ 对于底板浇筑完成的基坑工程,钢换撑在控制基坑结构变形、受力及周边地表沉降方面并无明显效果,在综合考虑各项工程条件的情况下,可取消钢换撑架设.
Stress and Deformation of Retaining Structure in Narrow and Long Foundation Pit Based on Steel Braces
Based on a large deep foundation pit project,the deformation characteristics of the pit support enclosure system,force characteristics,and changing trend of surrounding ground surface settlement during the excavation process of the narrow and long deep foundation pit with steel braces were studied through automated monitoring and numerical simulation.Midas GTS was used to establish the pit model,and the effects of the horizontal spacing of the steel brace,the distance of the third steel brace from the bottom of the pit,the preloaded axial force of the steel brace,and the change of the pile diameter of the pit enclosure on the deformation and force of the retaining pile structure and the surrounding ground surface settlement were investigated for the sections with and without steel brace,respectively.The results show that:① The horizontal spacing of different steel braces has different control effects on the deformation of the retaining structure and the surrounding ground surface settlement;smaller horizontal spacing of steel braces indicates smaller values of pile displacement,pile bending moment,and ground surface settlement of the foundation pit;② the position of the third steel brace has little effect on the stability of the foundation pit;③ the deformation of the retaining pile in the foundation pit and the surrounding ground surface settlement can be effectively controlled by applying the preloaded force of steel braces;④ with the increase in the diameter of the retaining pile,the deformation of the retaining structure and ground surface settlement values are reduced.Once it exceeds a certain pile diameter,the sensitivity of the pit deformation and the surrounding surface deformation to the diameter of the retaining pile will be weakened;⑤ for the foundation pit project with the completion of the base slab pouring,the steel brace does not have an obvious effect in controlling the deformation of the pit structure,the force,and the surrounding ground surface settlement.Through the comprehensive consideration of engineering conditions,the steel brace can be removed.

narrow and long deep foundation pitsteel bracedeformationforcenumerical simulation

徐立武、陈卓异、邱力杰

展开 >

中交一公局厦门工程有限公司,福建 厦门 361000

长沙理工大学 土木工程学院,湖南 长沙 410114

狭长形深基坑 钢换撑 变形 受力 数值模拟

国家自然科学基金国家自然科学基金湖南省自然科学基金

51708047517780692019JJ50670

2024

中外公路
长沙理工大学

中外公路

CSTPCD
影响因子:0.626
ISSN:1671-2579
年,卷(期):2024.44(3)
  • 13