工业水处理2025,Vol.45Issue(1) :179-185.DOI:10.19965/j.cnki.iwt.2024-0313

某燃煤电厂新型脱硫废水处理系统的调试与分析

Commissioning and analysis of new desulfurization wastewater treatment system in a coal-fired power plant

刘贵栋 胡阳阳 王璟 陈阳 王志勇 党雨露 徐浩
工业水处理2025,Vol.45Issue(1) :179-185.DOI:10.19965/j.cnki.iwt.2024-0313

某燃煤电厂新型脱硫废水处理系统的调试与分析

Commissioning and analysis of new desulfurization wastewater treatment system in a coal-fired power plant

刘贵栋 1胡阳阳 2王璟 3陈阳 3王志勇 4党雨露 5徐浩6
扫码查看

作者信息

  • 1. 西安交通大学能源与动力工程学院,陕西 西安 710049;西安西热水务环保有限公司高效灵活煤电及碳捕集利用封存全国重点实验室,陕西 西安 710054
  • 2. 陕西煤业化工技术研究院有限责任公司,陕西 西安 710100
  • 3. 西安西热水务环保有限公司高效灵活煤电及碳捕集利用封存全国重点实验室,陕西 西安 710054
  • 4. 华能长江环保科技有限公司,北京 102209
  • 5. 西安益通热工技术服务有限责任公司,陕西 西安 710054
  • 6. 西安交通大学能源与动力工程学院,陕西 西安 710049
  • 折叠

摘要

以山东某燃煤电厂脱硫废水改造项目为背景,采用一体式高效澄清工艺替换原有三联箱工艺,处理SS高达13 650 mg/L、CODCr为350 mg/L、重金属离子浓度超标的脱硫废水.处理前,先通过实验室小试确定基础加药量,缩小调试期间加药量范围;然后通过现场设备调试,优化运行参数,降低设备损坏率.经168 h的调试运行,新型脱硫废水处理系统运行稳定,污染物去除效果良好,出水SS在 1.5 mg/L,CODCr在 132.2 mg/L,总铅、总镉、总汞、总铬、总锌分别在 0.14、0.01、0.01、1.04、1.24 mg/L,出水水质满足《火电厂石灰石-石膏湿法脱硫废水水质控制指标》(DL/T 997-2020)要求.与电厂原三联箱工艺相比,一体式高效澄清工艺不仅对水质有明显提升,而且年运行费用由100多万元降低至50多万元,经济效益显著.

Abstract

In a desulfurization wastewater renovation project of a coal-fired power plant in Shandong Province,the original triple-tank process was replaced by integrated high efficiency clarification process to treat the desulfuriza-tion wastewater,with suspended solids of 13 650 mg/L,CODCr of 350 mg/L and heavy metal ion concentration ex-ceeding the standard.The basic chemical dosage could be determined by laboratory test.By on-site equipment joint adjustment,the operating parameters could be optimized and equipment damage rate could be reduced.After 168 h commissioning and running,the new process of desulfurization wastewater system was stable and effective.The efflu-ent SS was 1.5 mg/L,CODCr was 132.2 mg/L,total lead,total cadmium,total mercury,total chromium,and total zinc were 0.14,0.01,0.01,1.04,and 1.24 mg/L,respectively.The effluent quality could meet the relevant indicators of the Discharge Standard of Wastewater from Limestone-Gypsum Flue Gas Desulfurization System in Fossil Fuel Power Plants(DL/T 997-2020).Compared with the original triple-tank process in power plants,the integrated high-efficiency clarification process not only significantly improved water quality,but also reduced annual operating costs from over 1 million yuan to over 0.5 million yuan,with significant economic effects.

关键词

燃煤电厂/脱硫废水/一体式高效澄清装置/调试

Key words

coal-fired power plant/desulfurization wastewater/integrated high efficiency clarification equipment/commissioning