首页|工业冷却水系统自动化节能改造设计

工业冷却水系统自动化节能改造设计

扫码查看
某企业的冷却水系统通过后台人为操控,经常出现能耗浪费.该文在分析冷却塔的冷却极限和水泵的节能措施后,将冷却塔负荷率控制在50%并参考湿球温度启停,水泵采取同步变频,并把旁通阀执行机构更换成调节型来避免冬季低温时水泵大流量现象的发生.恒压供水和恒流控制的PID调校参数通过Lambda算法设定.在不影响系统的前提下完成,该改造可实现 0 操作运行,经连续7 个月的稳定运行,电耗同比降低43 716 kWh.
Automated energy-saving reconstruction design of industrial cooling water system
The cooling water system of a certain enterprise is often subject to energy waste due to manual control in the background.By analyzing the cooling limits of cooling towers and energy-saving measures for water pumps,the load rate of the cooling tower is controlled at 50%,and the start and stop of the motor are judged in combination with the wet bulb temperature.the water pump adopts synchronous frequency,the bypass valve actuator is replaced with a regulating type to avoid the occurrence of high flow at low temperatures in winter.The PID tuning parameters of constant pressure water supply and con-stant flow control is set by Lambda algorithm.Under the premise of not affecting the system,this renova-tion can achieve zero operation,after 7 months of stable operation,power consumption was 43,716 kWh lower than the same period last year.

cooling water systemindustrial automationenergy-saving reconstructionPID

赵金鑫

展开 >

杭州中美华东制药江东有限公司,浙江 杭州 310000

冷却水系统 工业自动化 节能改造 PID

2024

工业仪表与自动化装置
陕西鼓风机(集团)有限公司

工业仪表与自动化装置

CSTPCD
影响因子:0.393
ISSN:1000-0682
年,卷(期):2024.(6)