广州建筑2024,Vol.52Issue(2) :99-102.

基坑地下连续墙接缝渗水监测试验研究

Experimental Study on Joint Seepage Monitoring of Underground Diaphragm Wall in Foundation Pit

李康健 王保磊 王革 王伟停 李皓 庞志伟 丁泽明 赵鸿彬
广州建筑2024,Vol.52Issue(2) :99-102.

基坑地下连续墙接缝渗水监测试验研究

Experimental Study on Joint Seepage Monitoring of Underground Diaphragm Wall in Foundation Pit

李康健 1王保磊 1王革 2王伟停 2李皓 3庞志伟 2丁泽明 2赵鸿彬3
扫码查看

作者信息

  • 1. 广州铁路投资建设集团有限公司,广州 510420
  • 2. 中铁十九局集团轨道交通工程有限公司,北京 101300
  • 3. 广州市市政工程试验检测有限公司,广州 510520;广东省装配式地下结构检测与监测工程技术研究中心,广州 510520
  • 折叠

摘要

基坑地下连续墙接缝易出现渗水情况,如未及时处理,可能造成较大安全事故.本文提出一种基坑地下连续墙接缝渗水监测方法,首先通过室内模拟试验研究温度和渗水循环次数对监测结果的影响,再依托某地铁车站深基坑工程开展现场测试试验,验证本文监测方法的有效性.试验结果表明,常规温度条件下,渗水监测系统能比较准确地判定不同位置渗水情况,定位误差小于0.15m;随着渗水循环次数增加,计算渗水位置与实际渗水位置偏差缓慢增加,但最大定位偏差仍不超过0.2 m;本文方法适用于高水位地区深基坑地下连续墙接缝渗水监测,能实现基坑支挡结构渗漏水实时安全监测和预警.

Abstract

The joint of underground diaphragm wall of foundation pit is prone to water seepage,which may cause great safety accidents if it is not treated in time.In this paper,a monitoring method of joint seepage of underground diaphragm wall in foundation pit was proposed.Firstly,the influence of temperature and seepage cycle times on monitoring results was studied through indoor simulation test,and then the field test was carried out based on a deep foundation pit project of a subway station to verify the effectiveness of the monitoring method.The test results show that the water seepage monitoring system can accurately determine the water seepage situation at different positions under normal temperature conditions,and the positioning error is less than 0.15 m.With the increase of the number of seepage cycles,the deviation between the calculated seepage position and the actual seepage position increases slowly,but the maximum positioning deviation is still less than 0.2m.The method in this paper is suitable for joint seepage monitoring of underground continuous wall of deep foundation pit in high water level area,and can realize real-time safety monitoring and early warning of seepage of retaining structure of deep foundation pit.

关键词

地下连续墙/接缝渗水/渗水监测/试验研究

Key words

underground diaphragm walls/joint seepage/water seepage monitoring/experimental study

引用本文复制引用

基金项目

广州市建筑集团有限公司科技项目(2021-KJ026)

出版年

2024
广州建筑
广州市建筑科学研究院有限公司

广州建筑

影响因子:0.452
ISSN:1671-2439
参考文献量14
段落导航相关论文