广州建筑2024,Vol.52Issue(7) :73-76.

高压输电线极限距离下的菱形挂篮施工技术研究

Research on Construction Technology of Rhombic Hanging Basket at the Limit Distance of High-voltage Transmission Lines

王晓璜 黄佳栋 杨瀛 杨创捷 翁国锹
广州建筑2024,Vol.52Issue(7) :73-76.

高压输电线极限距离下的菱形挂篮施工技术研究

Research on Construction Technology of Rhombic Hanging Basket at the Limit Distance of High-voltage Transmission Lines

王晓璜 1黄佳栋 2杨瀛 1杨创捷 1翁国锹1
扫码查看

作者信息

  • 1. 广州市第三市政工程有限公司,广州 510060
  • 2. 广州市第三市政工程有限公司,广州 510060;广州建筑股份有限公司,广州 510030
  • 折叠

摘要

在高压输电线极限距离下建设桥梁,施工难度和安全风险显著提升.传统挂篮建筑高度较高,在这种情况下迫切需要改进和优化.在悬臂浇筑桥梁施工中,高压输电线的高度限制常常对传统菱形挂篮的使用构成挑战.本研究聚焦于新光快速路节点跨线桥施工,该桥采用变截面预应力混凝土连续箱梁,高压线底至桥面最小距离约为10.5m,而传统挂篮施工的安全净距不足.为了解决这一问题,本研究设计了一种新型挂篮,通过采用反吊梁结构,将前上横梁反吊安装,从而将整体高度减少1.5 m,确保了施工与高压输电线之间的垂直安全距离达到5.65 m,满足安全和施工要求.研究结果表明,新型挂篮不仅解决了高压线限制下的施工难题,还提供了一种安全可靠的施工方案,显著提升了类似环境下桥梁施工的安全性和效率.

Abstract

The construction of bridges under the extreme distance constraints of high-voltage transmission lines significantly increases construction difficulty and safety risks.Traditional hanging baskets have higher construction heights,necessitating urgent improvements and optimizations under such conditions.In cantilever bridge construction,the height restrictions of high-voltage transmission lines often challenge the use of traditional diamond-shaped hanging baskets.This study focuses on the construction of the Xinguang Expressway Node Overpass,which adopts a variable cross-section prestressed concrete continuous box girder.The minimum distance from the bottom of the high-voltage line to the bridge deck is approximately 10.5 meters,while the traditional hanging basket construction does not provide sufficient safety clearance.To solve this problem,this study designed a new type of hanging basket by adopting a reverse suspension beam structure,which allows the front upper beam to be installed in reverse suspension,thereby reducing the overall height by 1.5 meters.This ensures a vertical safety distance of 5.65 meters between the construction and the high-voltage transmission lines,meeting both safety and construction requirements.The research results indicate that the new hanging basket not only solves the construction difficulties posed by high-voltage line restrictions but also provides a safe and reliable construction solution,significantly enhancing the safety and efficiency of bridge construction in similar environments.

关键词

高压输电线/菱形挂篮/施工技术/悬臂浇筑

Key words

high-voltage transmission line/diamond-shaped hanging basket/construction technology/cantilever castin