首页|地电阻率受高压输电线路架线施工干扰的判定

地电阻率受高压输电线路架线施工干扰的判定

扫码查看
针对南京台两套地电阻率观测系统 2023 年 1 月 9 日出现的同步下降阶变,通过观测系统状况检查,自然环境、场地环境因素调查以及时间、空间多尺度多测项联合分析,判定此异常为受高压输电线路架线施工影响而非震兆异常,并对异常机理进行了简单解释.该判定和分析过程对地电阻率数据异常变化核实具有很好的参考价值,也为地电阻率异常数据的分析解释提供一种思路.
Judgment of Geo-resistivity Interference Caused by Stringing Construction of High Voltage Transmission Line
Regarding the synchronous decline in the two sets of geo-resistivity observation systems at Nanjing station on January 9,2023,we checked the condition of the observation system,investigated the natural and site environmental factors,as well as conducted multi-scale and multi-item joint analysis in time and space.The results show that this anomaly is affected by the construction of high-voltage transmission lines rather than earthquake precursor anomaly,and the explanation was provided for the abnormal mechanism.The process of analysis and determination of interference has a great reference value for verifying the causes of abnormal changes in geo-resistivity data,and also provides a train of thought for the analysis and interpretation of geo-resistivity abnormal data.

geo-resistivityhigh voltage transmission line stringing constructionmulti-scale joint analysisanalysis and determination of interference

王丽、李伟、沈红会、孙君嵩、李鸿宇

展开 >

江苏省地震局,南京 210014

地电阻率 高压直流输电 多尺度联合分析 干扰分析判定

地震科技星火计划中国地震局地震监测、预测、科研三结合课题

XH22001YC3JH-202301042

2024

华北地震科学
河北省地震局

华北地震科学

CSTPCD
影响因子:0.598
ISSN:1003-1375
年,卷(期):2024.42(2)
  • 19