River control scheme of Baishuo River in Changshun County,Guizhou Provine
The Baisuo River in Changshun County,Guizhou Province has not yet completed the systematic regulation.In recent years,flooding has occurred,inundating farmland,and the flood control situation cannot be ignored.This paper evaluates the flood discharge capacity of the Baisuo River based on the analysis of rainstorm and flood,and proposes the optimal engineering treatment measures on the results of different construction shapes of the dam according to topography,geology and other conditions of the Baisuo River.This paper provides significant references for the subsequent work on flood control,river regulation in the future.