Analysis and calculation of erosion on foundation of high voltage transmission line tower engineering
Taking the 220 kV transmission line of the infrastructure construction project in the Rare Earth Metal Industrial Park in Hetian County,Xinjiang as an example,when it is arranged to cross a river,it involves dual constraints of power and water conservancy regulations.This article analyzes the applicability of various erosion formulas and determines the suitable erosion calculation results and formulas.Ultimately,it determines the total erosion depth as the sum of general erosion depth and local erosion depth,providing reference for the evaluation of similar projects.