Based on the comparison of the advantages and disadvantages of various types of schemes for a water intake pump station that needs to cross a level 2 embankment,it is recommended to choose the siphon pump station scheme that is easy to construct,energy-saving,minimally disturbance to the embankment,and has high safety.The design process of the key areas,siphon pipe and siphon opening and closing device,is introduced and calculated,providing reference and inspiration for similar water intake engineering designs.
关键词
虹吸/取水泵站/泵站选型/真空度/真空泵
Key words
siphon/water intaking pump station/pump station selection/vacuum degree/vacuum pump