Scale demonstration and characteristic water level determination of Jinggangshan Navigation and Power Hub
The Ganjiang Jinggangshan Navigation and Power Hub Project is a key construction project in Jiangxi Province during the 13th Five Year Plan period.It is a large-scale navigation and power generation hub project with comprehensive benefits.In order to fully leverage the improvement of the Ganjiang River waterway level,enhance shipping capacity,and enhance the comprehensive benefits of the Jinggangshan Navigation and Power Hub Project and various cascade hub projects,this article reviews the basin planning and Jinggangshan hub project tasks,demonstrates the scale of navigation buildings,conducts hydraulic kinetic energy calculations,and obtains the results of runoff and flood at the dam site section.Based on historical achievements,a characteristic water level conclusion has been drawn through comparative analysis of the connection with the upstream hub water level,its impact on the power station,reservoir inundation indicators,and engineering economic benefits.This study can provide a basis for the formulation of the Ganjiang cascade hub plan.
avionics hubGanjiang cascade hubnavigation channelcharacteristic water level