水科学与工程技术2024,Issue(6) :62-64.DOI:10.19733/j.cnki.1672-9900.2024.06.16

温泉水利枢纽坝后弃渣戗堤设计

Design of the spoil berm behind the dam of Wenquan Water Conservancy Project

郭建飞
水科学与工程技术2024,Issue(6) :62-64.DOI:10.19733/j.cnki.1672-9900.2024.06.16

温泉水利枢纽坝后弃渣戗堤设计

Design of the spoil berm behind the dam of Wenquan Water Conservancy Project

郭建飞1
扫码查看

作者信息

  • 1. 新疆水利水电勘测设计研究院有限责任公司,乌鲁木齐 830000
  • 折叠

摘要

鉴于山区水利工程建设面临弃渣场布置困难、弃渣量大、运输距离远等诸多设计难点,结合温泉水利枢纽工程弃渣场设计,提出在坝后设置弃渣戗堤的一种弃渣新方法,可有效解决山区水利工程建设弃渣困难、运输距离远、投资过高等难题,可为相关水利枢纽弃渣场设计提供参考.

Abstract

In view of the difficulties faced by mountain hydraulic engineering in the design of waste dump sites,such as the difficulty in layout,large amount of waste,long distance of transportation,etc.,this paper proposes a new model of dumping dregs by placing a dumping dregs dike behind a dam,which can effectively solve the technical problems of hydraulic engineering dumping dregs in mountainous areas,such as the difficulty of transporting dregs over a long distance and high investment,etc.,it can be used for reference in the design of waste slag yard of Water Conservancy project.

关键词

水利枢纽/坝后/弃渣戗堤

Key words

hydro-junction/behind the dam/abandoned slag dike

引用本文复制引用

出版年

2024
水科学与工程技术
河北省水利学会 水利部河北水利水电勘测设计研究院

水科学与工程技术

影响因子:0.334
ISSN:1672-9900
段落导航相关论文