摘要
鉴于山区水利工程建设面临弃渣场布置困难、弃渣量大、运输距离远等诸多设计难点,结合温泉水利枢纽工程弃渣场设计,提出在坝后设置弃渣戗堤的一种弃渣新方法,可有效解决山区水利工程建设弃渣困难、运输距离远、投资过高等难题,可为相关水利枢纽弃渣场设计提供参考.
Abstract
In view of the difficulties faced by mountain hydraulic engineering in the design of waste dump sites,such as the difficulty in layout,large amount of waste,long distance of transportation,etc.,this paper proposes a new model of dumping dregs by placing a dumping dregs dike behind a dam,which can effectively solve the technical problems of hydraulic engineering dumping dregs in mountainous areas,such as the difficulty of transporting dregs over a long distance and high investment,etc.,it can be used for reference in the design of waste slag yard of Water Conservancy project.