Design of the spoil berm behind the dam of Wenquan Water Conservancy Project
In view of the difficulties faced by mountain hydraulic engineering in the design of waste dump sites,such as the difficulty in layout,large amount of waste,long distance of transportation,etc.,this paper proposes a new model of dumping dregs by placing a dumping dregs dike behind a dam,which can effectively solve the technical problems of hydraulic engineering dumping dregs in mountainous areas,such as the difficulty of transporting dregs over a long distance and high investment,etc.,it can be used for reference in the design of waste slag yard of Water Conservancy project.