首页|超高Al2O3烧结矿综合性能试验研究

超高Al2O3烧结矿综合性能试验研究

扫码查看
长期以来行业对于高Al2O3 烧结矿性能的研究停留在中低温阶段,而对最为关键的高温性能研究较少,使得高铝资源的使用受到严重限制,低铝资源逐年减少以及部分品种消失严重影响了行业发展的资源供给.通过对高Al2O3 烧结矿性能的系统研究,在平衡各项性能指标对高炉实际影响的基础上,重点突出改善烧结矿高温软熔滴落性能,解决了高Al2O3 烧结矿使用的行业技术难题,并在实际生产中取得了较好的使用效果.依据性能互补、结构优化、参数合理控制等技术措施,克服了高铝资源烧结的性能缺陷,在拓宽资源保障供给的同时,增大了铁水降本的空间.
EXPERIMENTAL RESEARCH ON THE COMPREHENSIVE PERFORMANCE OF ULTRA-HIGH Al2O3 SINTERED ORE
For a long time,the research on the performance of high Al2O3 sintered ore in the industry has remained at the medium and low temperature stage,while there is relatively little research on the most critical high-temperature performance,which seriously limits the use of high aluminum resources.Faced with the decreasing low aluminum resources and the disappearance of some varieties,it seriously threatens the resource guarantee for industry development.Through systematic research on the performance of high Al2O3 sintered ore,and on the basis of balancing the impact of various performance indicators on the actual blast furnace,the focus is on improving the high-temperature soft melt dripping performance of sintered ore,solving the industry technical difficulties in the use of high Al2O3 sintered ore,and achieving good results in actual production.Based on technical measures such as complementary performance,structural optimization,and reasonable parameter control,the performance defects of high aluminum resource sintering have been overcome.While expanding resource guarantee supply,the space for cost reduction of molten iron has also been increased.

SinteringUltra-high Al2O3 sinterPerformance researchProduction practice

陈伟、余丽娜、靳亚军、关红兵、申勇

展开 >

河南钢铁集团有限公司

河南省金冶新材料科技有限公司

安阳钢铁股份有限公司

烧结 超高Al2O3烧结矿 性能研究 生产实践

2024

河南冶金
河南省金属学会安阳钢铁集团有限责任公司

河南冶金

影响因子:0.16
ISSN:1006-3129
年,卷(期):2024.32(2)