Settlement Analysis and Treatment of Road and Bridge Transition Section
This article uses numerical simulation methods to study the deformation characteristics of the road and bridge transition sec-tion,and compares and analyzes the settlement changes of the original transition section model and the high-pressure jet grouting model.The longitudinal settlement of the original transition section is distributed in a"hook"shape,with a maximum settlement value of-9.2 cm.The differential settlement shows a variation pattern of first decreasing,then increasing,and then decreasing.The maxi-mum lateral settlement of the two working conditions is-6.2 cm,and the minimum value is-4.9 cm,indicating a relatively small o-verall settlement.After using high-pressure grouting and spraying,the longitudinal and transverse settlement of the roadbed was effec-tively controlled,and the deformation of the"hook"shape in the longitudinal direction was well improved,while the overall settlement in the transverse direction was reduced.
bridgehead bumproad and bridge transition sectiondifferential settlement