超大跨度改扩建隧道深塌方冒顶处理技术

Treatment Technology for Deep Collapse and Roof Fall in Extra Large Span Reconstruction and Expansion Tunnel

闫宪政
黑龙江交通科技2024,Vol.47Issue(2) :132-134,140.

超大跨度改扩建隧道深塌方冒顶处理技术

Treatment Technology for Deep Collapse and Roof Fall in Extra Large Span Reconstruction and Expansion Tunnel

闫宪政1
扫码查看

作者信息

  • 1. 中铁十六局集团路桥工程有限公司,北京 101500
  • 折叠

摘要

通过分析超大跨度改扩建隧道深塌方冒顶的原因,提出了一系列的处理方案,包括加强地质勘察、优化施工方法、加强支护措施等方面.为了验证这些处理技术方案的可行性和有效性,进行了模拟实验和工程实践.结果表明,这些处理技术方案能够有效地控制隧道深塌方冒顶的发生,提高工程的安全性和可靠性.

Abstract

By analyzing the causes of deep collapse and roof collapse in the super long span renovation and expansion tunnel,a series of solutions have been proposed,including strengthening geological exploration,optimizing construction methods,and strengthening support measures.In order to verify the feasibility and effectiveness of these processing technology solutions,conducted simulation experiments and engineering practices.The results show that these treatment techniques can effectively control the occurrence of deep collapse and roof caving in tunnels,and improve the safety and reliability of the project.

关键词

超大跨度/改扩建隧道/塌方冒顶/中隔壁/帷幕注浆/护拱

Key words

super large span/reconstruction and expansion of tunnel/collapse and roof fall/middle wall of tunnel/curtain grouting/sup-porting arch