Discussion on EPC Project Management Mode of Yanzi Expressway
To explore the advantages and disadvantages of expressway EPC management mode,in Shaanxi province's largest(as of 2022)at the end of the design unit led by Yanzi Expressway EPC project were studied,analysis the EPC management pattern in the management system,construction schedule,the design quality,construction quality and investment control,the advantages and short-comings of management coordination,etc.The results show that:EPC projects have the advantages of timely cross-construction coordi-nation,efficient and fast design service,fast advance of preliminary work,short transportation distance of raw materials,conducive to in-vestment control,and reduce the workload of owner management and coordination.There are also some problems,such as incomplete laws,regulations and management systems,failure to follow up measurement and payment in time,and mismatch between supervision management mode and EPC mode,It is necessary to improve the relevant management system of general contracting mode,carefully se-lect the general contractor,improve the preliminary design depth and accuracy of the general contracting project,optimize the measure-ment payment method,optimize the supervision management mode and other measures to make the EPC mode play its due role.