高墩连续刚构桥0#~1#块托架反力架预压施工技术

Preloading Construction Technology of Reaction Frame of 0#~1# Block Bracket of High Pier Continuous Rigid Frame Bridge

徐青
黑龙江交通科技2024,Vol.47Issue(6) :117-120.

高墩连续刚构桥0#~1#块托架反力架预压施工技术

Preloading Construction Technology of Reaction Frame of 0#~1# Block Bracket of High Pier Continuous Rigid Frame Bridge

徐青1
扫码查看

作者信息

  • 1. 中铁二十局集团生产管控督导中心,陕西 西安 710016
  • 折叠

摘要

为解决传统的物料堆载预压方式对高墩大跨连续刚构0#~1#块进行加压存在高空作业不安全、难以实施以及复杂性大等问题,以银昆高速新建工程友联红河特大桥高墩连续刚构0#~1#块为例,对预压施工的特点、难点和改进措施进行了分析,并提出了一种适用于高墩大跨连续刚构0#~1#块托架反力架预压施工技术即在桥梁墩顶和墩旁埋设承重托架,并设置观测点和反力架,对托架进行反向荷载预压.此外还需要布设分配梁,以实现荷载的均衡分配.

Abstract

In order to solve the problems of unsafe,difficult to implement and complex high-altitude operation in the traditional mate-rial preloading method to pressurize the 0#~1#blocks of high-pier and long-span continuous rigid frame,taking the 0#~1#blocks of high-pier continuous rigid frame of Youlian Honghe Bridge in the new project of Yinkun Expressway as an example,the character-istics,difficulties and improvement measures of preloading construction are analyzed,and a kind of preloading construction technology suitable for the 0#~1#blocks of high-pier and long-span continuous rigid frame is put forward,that is,the load-bearing brackets are buried on the top and side of the bridge pier,and the observation points and reaction frames are set up to carry out reverse load pre-loading on the brackets.In addition,it is necessary to arrange the distribution beam to achieve the balanced distribution of load.

关键词

连续刚构/荷载预压/反力架

Key words

continuous rigid frame/load preload/reaction frame