以国道522 线路工程为背景,深入探讨了路基土方填筑及压实技术.通过详细的场地测量与清理、旧路面挖除等前期准备工作,确保了施工基础的稳固.在路基土方填筑阶段,采用过筛处理去除大粒径土石料,结合破碎、拌和与添加特定改良剂等措施,有效提升了填筑材料的性能.填筑完成后,通过精心的压实作业,确保了路基的密实度和稳定性.经过严格的试验论证,国道522 线路基的最大沉降量仅为4.68 mm,无严重沉降变形,施工质量得到了有效的保证.
Foundation Earthwork Filling and Compaction Technology of National Highway 522
Based on the National Highway 522 line project,the filling and compaction technology of subgrade earthwork is discussed in depth.Through the detailed site survey and cleaning,the old road surface excavation and other preparatory work to ensure the construc-tion of a solid foundation.In the stage of roadbed earthwork filling,the performance of filling material is improved effectively by using sieving treatment to remove large-size soil and stone materials,combining with crushing,mixing and adding special modifier.After the completion of filling,through careful compaction operations to ensure the compactness and stability of the roadbed.Through strict test,it is proved that the maximum settlement of subgrade of National Highway 522 is only 4.68 mm,without serious settlement deforma-tion,and the construction quality is effectively guaranteed.

subgradeearth fillingcompactionsettlement

路俊兰

展开 >

山西路桥第八工程有限公司,山西 运城 044000

路基 土方填筑 压实 沉降量

2024

黑龙江交通科技
黑龙江省交通科学研究所,黑龙江省交通科技情报总站

黑龙江交通科技

影响因子:0.977
ISSN:1008-3383
年,卷(期):2024.47(7)
  • 4