首页|深圳轨道交通3号线跨龙岗河桥梁方案比选

深圳轨道交通3号线跨龙岗河桥梁方案比选

扫码查看
分析周边环境、地面交通、防洪排涝、线路等建设条件,基于功能完善、景观优美、施工便利、造价经济的基本原则,针对深圳市轨道交通3 号四期工程上跨龙岗河桥梁开展V型刚构桥、连续梁拱桥、双塔斜拉桥及独塔斜拉桥等多种方案进行比较.综合比选,推荐采用V型刚构桥方案.
Bridge Scheme Comparison of Shenzhen Rail Transit Line 3 Across Longgang River
The construction conditions such as surrounding environment,ground transportation,flood control and drainage,and lines are analyzed.Based on the basic principles of perfect function,beautiful landscape,convenient construction and economical cost,the V-shaped rigid frame,continuous beam arch,double-tower cable-stayed bridge and single-tower cable-stayed bridge are carried out for the Longgang River Bridge of Shenzhen Rail Transit line 3 Phase IV Project.Through comprehensive comparison and selection,the V-shaped rigid frame scheme is recommended.

rail transitV-shaped rigid frame bridgecontinuous beam arch bridgecable-stayed bridgescheme comparison

王欣欣

展开 >

广州地铁设计研究院股份有限公司,广东 广州 510010

轨道交通 V型刚构桥 连续梁拱桥 斜拉桥 方案比选

2024

黑龙江交通科技
黑龙江省交通科学研究所,黑龙江省交通科技情报总站

黑龙江交通科技

影响因子:0.977
ISSN:1008-3383
年,卷(期):2024.47(9)
  • 1