Bridge Scheme Comparison of Shenzhen Rail Transit Line 3 Across Longgang River
The construction conditions such as surrounding environment,ground transportation,flood control and drainage,and lines are analyzed.Based on the basic principles of perfect function,beautiful landscape,convenient construction and economical cost,the V-shaped rigid frame,continuous beam arch,double-tower cable-stayed bridge and single-tower cable-stayed bridge are carried out for the Longgang River Bridge of Shenzhen Rail Transit line 3 Phase IV Project.Through comprehensive comparison and selection,the V-shaped rigid frame scheme is recommended.