以重庆市九龙坡区市政隧道下穿铁路站场为依托,通过数值模拟与现场实测相结合的方法,按实际情况,对下穿暗挖隧道过站区施工过程进行模拟,对下穿隧道施工过程中引起既有铁路站场变形及控制措施开展研究,对既有铁路变形进行评价,得出适用于该工程地质的控制措施,使新建隧道在保证铁路正常运营及安全下,下穿既有铁路站场。
Implementation Plan Design for Mined Tunnel Crosses under Existing Railway Yard
Based on the underpass railway yard of a tunnel project in Jiulongpo District in Chongqing,this paper simulates the excava-tion process of the underpass area according to the actual excavation sequence and construction technology through the combination of numerical simulation and field measurement.From the perspective of construction mechanics mechanism analysis,the deformation and control measures caused by the existing railway yard during the construction of the underpass tunnel are studied.By evaluating the de-formation of the existing railway,the control measures suitable for the engineering geology are obtained,so that the new tunnel can pass through the existing railway yard under the guarantee of the normal operation and safety of the railway.

mined tunnelrailwayscrossing constructionreinforcement measure

李星、龚贵友、张轩铭、唐文洋、张丛

展开 >

中冶赛迪城市建设(重庆)有限公司,重庆 401122

中机中联工程有限公司,重庆 400041

暗挖隧道 铁路 下穿施工 加固措施

2024

黑龙江交通科技
黑龙江省交通科学研究所,黑龙江省交通科技情报总站

黑龙江交通科技

影响因子:0.977
ISSN:1008-3383
年,卷(期):2024.47(10)