为了研究不同交通量下,限速值、封闭车道数、养护维修作业区段长度对双向八车道高速公路交通组织方式的影响。建立仿真模型模拟不同年平均日交通量下四个典型断面,限速为60 km/h和80 km/h、封闭车道数为1 和2、养护维修作业区段长度为1、2、3、4 km的不同变量组合条件共56 种工况,计算得到平均行程时间和最大排队长度指标。结果表明,断面一、断面二平均行程时间与养护维修作业区段长度均呈线性增长;限速为60 km/h时的平均行程时间均大于限速为80 km/h时,最大排队长度均为0。断面三封闭1 个车道时与断面一、二相似,封闭2 个车道时,平均行程时间约为封闭1 个车道时的2~4 倍,产生拥堵;断面四平均行程时间约为通畅路段的6~12 倍,最大排队长度超过7 km。因此,断面一、断面二选取限速为80 km/h时,封闭2 个车道以及维修区段长度为4km的交通组织;断面三建议选取限速为80 km/h,封闭 1 个车道以及维修区段长度为4km的交通组织;断面四不建议全天封闭施工,有紧急施工需要,可根据实际交通运行时所能承受的最大排队长度,合理确定封闭时间或者夜间施工。
Traffic Organization Optimization of Expressway Maintenance Construction
In orcler to study the influence of speed limit value,closed lane number,and working area length on the traffic organization mode of a two-way,eight-lane expressway under different traffic volumes.The traffic simulation model to simulate four typical sec-tions of different annual average daily traffic volumes of expressways.The speed limit value is 60 km/h and 80 km/h,the closed lane numbers are 1 and 2,respectively,and the working area length is 1~4 km.Fifty-six working conditions of different variable combina-tions are calculated to obtain the average travel time index and the maximum queue length index.The results show that the average travel time and working area length of section 1 and section 2 increase linearly.The average travel time of 60 km/h is greater than 80 km/h,and the maximum queue length is 0.Section 3 is similar to section 1 and section 2 when close to one lane.When closing two lanes,the average travel time is about 2 to 4 times that when closing one,resulting in congestion.For section 4,the average travel time is about 6~12 times that of the unobstructed section,and the maximum queue length is more than 7 km.Therefore,the traffic organi-zation mode with a speed limit of 80 km/h,close two lanes,and a working area length of 4 km is selected for section 1 and section 2.It suggests that the traffic organization mode with a speed limit of 80 km/h,closing one lane,and a working area length of 4 km should be selected in section 3.It is not recommended for all-day closed construction in section 4.If section 4 has urgent construction needs,the closure time or night construction can be reasonably determined according to the maximum queue length the actual traffic operation can withstand.

road engineeringmaintenance constructiontravel timequeue lengthtraffic simulationtraffic organization

袁佳杨、陈建民、刘东海、刘浩志

展开 >

湖南省交通规划勘察设计院有限公司,湖南 长沙 410200

湖南省茶江高速公路建设开发有限公司,湖南 长沙 410204

长沙理工大学 交通运输工程学院,湖南 长沙 410014

道路工程 养护施工 行程时间 排队长度 交通仿真 交通组织

2024

黑龙江交通科技
黑龙江省交通科学研究所,黑龙江省交通科技情报总站

黑龙江交通科技

影响因子:0.977
ISSN:1008-3383
年,卷(期):2024.47(10)