首页|地铁深基坑开挖对邻近建筑物影响的实测与数值模拟分析

地铁深基坑开挖对邻近建筑物影响的实测与数值模拟分析

扫码查看
以绍兴市地铁1 号线城市广场站项目为研究背景,基于现场监测数据,对地连墙水平位移、地表沉降、建筑物沉降等因素进行探讨和分析,使用有限元分析软件建立相应的数值模型,探讨和分析不同工况下地连墙水平位移、地表沉降和建筑物沉降随基坑开挖进行的变形规律,最后再把模拟结果和实测数据对照,进一步地分析和验证。结果显示:数值模拟所得位移数据与工程实测数据较为贴合;周边地表沉降的最大值产生在基坑标准段端部且距离基坑8m位置,而非产生于基坑边缘位置处,最大沉降值达到22。75 mm;墙体的最大水平位移一般在墙体深度的中部靠下位置发生。
Measurement and Numerical Simulation Analysis of the Influence of Metro Deep Foundation Pit Excavation on Adjacent Buildings
Taking the city square station project of Shaoxing Metro Line 1as the research background,through on-site monitoring data,the horizontal displacement of the diaphragm wall,surface settlement,building settlement and other factors are discussed and analyzed.Using finite element analysis software,the corresponding numerical model is established to explore and analyze the horizontal displace-ment of the diaphragm wall under different working conditions.The deformation law of surface settlement and building settlement with foundation pit excavation is compared and analyzed.Finally,the simulation results are compared with the measured data to further ana-lyze and verify.The results show that the displacement data obtained by numerical simulation are in good agreement with the measured data.The maximum settlement of the surrounding surface is generated at the end of the standard section of the foundation pit and 8 m away from the foundation pit,rather than at the edge of the foundation pit,and the maximum settlement value reaches 22.75 mm.The maximum horizontal displacement of the wall generally occurs in the middle of the wall depth.

subway deep foundation pitadjacent buildingsfinite element analysisbuilding settlement

金修伟、胡碧辉、刘达

展开 >

江西省水利科学院,江西 南昌 330029

地铁深基坑 邻近建筑物 有限元分析 建筑物沉降

2024

黑龙江交通科技
黑龙江省交通科学研究所,黑龙江省交通科技情报总站

黑龙江交通科技

影响因子:0.977
ISSN:1008-3383
年,卷(期):2024.47(12)