摘要

农业现代化进程不断加快,农田水利工程建设规模日渐扩大,水库堤坝项目逐渐增多,这对施工质量提出了更高要求,既要保证水利工程稳定可靠运行,还要防止渗漏、破坏问题的发生.从水利工程中水库堤坝渗漏的原因入手,对灌浆、防渗墙、监测等水库堤坝防渗施工方法进行分析,以阳江市江城区某水库除险加固工程为例,探讨水库堤坝除险加固作业过程及方法,在完成水库除险加固施工后,重新检查大坝抗洪能力是否满足规范要求、迎水坡面板水位变化区风化情况、防浪墙是否存在裂缝、溢洪道进口段於堵严重等问题,对坡顶至坡脚现浇C25 砼护坡和背水坡表进行回填土作业,提升坝体稳固性和防渗性.通过科学制定除险加固方案,落实好水库大坝混凝土护坡、出口排水渠清淤疏浚等工作,充分发挥水库效益.

Abstract

Under the background of accelerating process of agricultural modernization,the construction scale of farmland water conservancy projects is gradually expanding,and the number of reservoir dam projects is gradually increasing.Higher requirements are put forward for construction quality.In addition to ensuring the stable and reliable operation of water conservancy projects,it is also necessary to prevent leakage and damage problems from occurring.The study starts with the causes of leakage in reservoir embankments in hydraulic engineering;and analyzes anti-seepage measures for reservoir embankments:the construction methods of grouting,anti-seepage walls,and monitoring,etc.Through taking a reservoir reinforcement project in Jiangcheng District,Yangjiang City as an example,the study discusses the process and methods of reservoir embankment reinforcement work.After the completion of the reservoir reinforcement construction,we should re-check whether the flood resistance of the dam meets the standard requirements,the weathering condition of the water level change area of the facing slope panel,whether there are cracks in the wave wall,and the entrance section of the spillway is seriously blocked,etc.The backfill of cast-in-place C25 concrete slope protection and back water slope surface from the top to the foot of slope is carried out to improve the stability and seepage prevention of the dam body.It is suggested to formulate the scientific risk reinforcement plan,and implement the reservoir dam concrete slope protection,and exit drainage channels dredging,etc.,so as to fully play the benefits of the reservoir.

关键词

水利工程/水库堤坝/防渗施工/方法

Key words

Water conservancy engineering/Reservoir embankment/Anti seepage construction/Method