In order to solve the cross phenomenon between the stripping transportation system and the coal transportation system in an open pit coal mine,through taking the location of the B interchange project as the research object,the study selects an interchange engineering method reasonable to the current transportation situation of the open pit;and determines corrugated pipe scheme under the combination of qualitative and quantitative analysis based on site investigation.In order to further improve the economic benefits and mining efficiency of the open pit mine,3 sets of steel bellows are proposed,and the optimal scheme for the steel bellows is selected.
关键词
露天立交工程/钢波纹管/运输系统优化/交叉运输
Key words
Open-air interchange project/Steel bellows/Transportation system optimization/Cross transport