黑龙江科学2024,Vol.15Issue(10) :120-122,126.

小流域河道综合整治中塑钢板桩护岸技术应用研究

Research on the Application of Plastic Sheet Pile Revetment Technology in the Comprehensive Regulation of Small River Basin

詹美龙
黑龙江科学2024,Vol.15Issue(10) :120-122,126.

小流域河道综合整治中塑钢板桩护岸技术应用研究

Research on the Application of Plastic Sheet Pile Revetment Technology in the Comprehensive Regulation of Small River Basin

詹美龙1
扫码查看

作者信息

  • 1. 上海浦东路桥(集团)有限公司,上海 201206
  • 折叠

摘要

为研究塑钢板桩护岸技术在小流域河道综合整治中的应用效果,结合实例,对比塑钢板桩护岸技术、生态仿木桩护岸技术、插板桩护岸技术优缺点及适用性,确定塑钢板桩护岸方案并对其进行优化设计及计算,确定塑钢板桩结构形式.经施工统计,塑钢板桩护岸日施工进度可达22.4~33.6 延米,优于生态仿木桩护岸、插板桩护岸,护岸土层剪应力为6 kPa~12 kPa,剪应力不大,说明塑钢板桩护岸工后稳定性良好.

Abstract

In order to study the application effect of plastic sheet pile revetment technology in comprehensive river regulation of small watershed,the study combines with the examples;compares the advantages and disadvantages,and applicability of plastic sheet pile revetment technology,ecological imitation wooden pile revetment technology and sheet pile revetment technology;determines the revetment scheme of plastic sheet pile;optimizes the design and calculation of plastic sheet pile revetment scheme;and determines the structural form of plastic sheet pile.According to the construction statistics,the daily construction progress of the plastic sheet pile revegeting can reach 22.4~33.6 km,which is better than the ecological imitate-wood pile revegeting and sheet pile revegeting.Meanwhile,the shear stress of the revegeting soil layer is 6 kPa~12 kPa,and the shear stress is not large,indicating that the stability of the plastic sheet pile revegeting is good after construction.

关键词

小流域/河道治理/塑钢板桩/护岸施工

Key words

Small watershed/River treatment/Plastic sheet pile/Bank protection construction

引用本文复制引用

出版年

2024
黑龙江科学
黑龙江省科学院

黑龙江科学

影响因子:1.014
ISSN:1674-8646
参考文献量5
段落导航相关论文