首页|长庆油田侧钻井?95.25 mm套管固井完井技术应用

长庆油田侧钻井?95.25 mm套管固井完井技术应用

扫码查看
长庆油田油井侧钻井完井方式采用悬挂ϕ88.9 mm尾管固井完井,固井后油管内径仅76 mm,限制了后期修井作业及压裂增产作业的能力和规模,且现有完井管柱无法进行全通径压裂施工,不能满足致密油气储层压裂技术需求.通过应用ϕ95.25 mm套管扩大管柱内径(ϕ82.25 mm)以及分段压裂用尾管悬挂器与回接装置,尾管固井后利用水力泵送桥塞+分段压裂施工工艺,改造效果和施工效率得到了极大提升.侧钻井ϕ95.25 mm套管固井完井技术在长庆油田完成了5 口井现场应用,固井质量合格率 100%,较 ϕ88.9 mm 油管固井完井平均初期日产油量提高了46.5%,施工时间缩短了80%,对区域内侧钻井钻完井具有较好的借鉴作用.
Application of sidetracking drilling ?95.25 mm casing cementing and completion technology in Changqing Oilfield
The sidetracking drilling and completion method in Changqing Oilfield used the liner cementing with ϕ88.9 mm hanging,and the inner diameter of the tubing after cementing was only ϕ76 mm,which limited the ability and scale of the late workover operation and fracturing stimulation operation.Besides,the existing completion string cannot be used for full-diameter fracturing,which cannot meet the requirements of tight oil and gas reservoir fracturing technology.By expanding the bore diameter(ϕ82.25 mm)with theϕ95.25 mm casing and using the liner hanger and tieback assembly for staged fracturing,the hydraulic pumping bridge plug+staged fracturing process after the liner cementing was carried out,which greatly im-proved the effect and efficiency of the construction.The lateral drilling with ϕ95.25 mm casing cementing and completion technology has been applied in 5 wells in Changqing Oilfield,the cementing quality quali-fied rate is 100%,the average initial daily production is increased by 46.5%compared with the completion with ϕ88.9 mm tubing,and the construction time is shortened by 80%.Therefore,the technology applica-tion provides a good reference for the inner drilling and completion in the area.

sidetracking drillingliner cementingstaged fracturingliner hanger and tieback assembly

刘志雄、王文斌、陈小荣

展开 >

中国石油川庆钻探工程有限公司钻采工程技术研究院,陕西西安 710021

低渗透油气田勘探开发国家工程实验室,陕西西安 710021

侧钻井 尾管固井 分段压裂 尾管回接装置

中国石油天然气集团有限公司科研项目

2019D4209

2024

石油地质与工程
中国石化河南油田分公司

石油地质与工程

影响因子:0.453
ISSN:1673-8217
年,卷(期):2024.38(5)