Aiming at the dam of Naye Reservoir project,ABAQUS numerical simulation software was used to analyze seepage parameters such as pore ratio,saturation and pore pressure of the dam body,and a targeted anti-seepage treatment scheme was proposed,and the reinforcement effect was numerically analyzed by finite element software.The results show that the pore ratio,saturation and pore pressure of the dam increase when the dam is immersed in water.After the installation of the seepage barrier wall,the pore ratio and saturation of the front and back of the seepage barrier wall appear sudden changes,and the seepage barrier effect is obvious,which can meet the requirements of normal operation of the project.
关键词
挡水建筑物/结构设计/渗流分析/受力分析
Key words
water retaining building/structural design/seepage analysis/force analysis