Research on Air Replacement Technology of WT2000 Series Wind Turbine Gearbox
In order to reduce the overall replacement cost of the main gearbox(growth gearbox)of the doubly fed asynchronous wind turbine and make the operation process more concise,based on WT2000 series wind turbines,a main shaft fixing tooling was de-signed to replace the role of gearbox and fix the rear end of main shaft.Some new operation processes and methods in the air replacement of WT2000 series wind turbine gearbox were explored and practiced.The results show that the proposed structure greatly reduces the op-eration cost(including crane cost,time and labor cost)of gearbox replacement of WT2000 series wind turbine,the loss of power gener-ation during maintenance is reduced.
wind turbinegear boxreplacement in the airmain shaft fixing tooling