Research on wave pile revetment design based on PLAXIS 2D software:a case study of the Jienan River section from Yinghe River to Quanhe River in the river management project(Phase Ⅰ)
Taking the Jiennan River section from Ying River to Quan River in the river management project(Phase Ⅰ)as an example,PLAXIS finite element software was used to conduct numerical simulation calculations under different specifications of wave piling,soil retaining wall height,and construction methods.The study analyzed and summarized the variation patterns of wave piling top displacement and bank backfill settlement.When employing the driven pile method,it is advisable to control the height of the cantilever section of the wave piling for soil retention within the range of 2.0 to 3.0 meters.The relevant outcomes can serve as design references for similar engineering projects.
river channel regulationwave bafflePLAXISpile head displacementground settlement