Bottleneck Process Scheduling Based on Garment Hanging Assembly Line
Aiming at the problem that most garment hanging assembly lines could not realize the automatic determination and scheduling of the bottleneck process,and the productivity could not be effectively improved,an event-driven bottleneck process scheduling strategy was proposed.A simulation model that can reflect the characteristics of the garment hanging assembly line was constructed by using Plant Simulation software,and the shirt assembly line had been verified.A series of indicators were used to verify the feasibility of the scheduling scheme.The research shows that the scheduling scheme can cope with the disturbance caused by the unstable and uncertain factors in the production system,realize the dynamic sched-uling of the bottleneck process,and improve the production efficiency and resource utilization.