首页|某水利枢纽工程泄洪冲沙洞动床冲刷试验研究

某水利枢纽工程泄洪冲沙洞动床冲刷试验研究

扫码查看
针对某水利枢纽泄洪冲沙洞,采用动床模型试验的方法对消能区下游河床冲刷情况进行模拟研究,并根据不同泄洪工况冲刷情况提出优化思路和修改方案。试验结果表明:各工况下对下游河床的冲刷深度及冲坑形状,冲坑最低点均在退水渠轴线上;在校核工况下最大冲坑深度可达 3。84m,钢筋石笼末端冲坑深度为1。38m。因此,退水渠末端防冲齿墙深度应不小于 2m,才可保证退水渠及消力池自身安全。
Experimental study on the moving bed scour of the flood discharge sand flushing hole in a water conservancy project
According to the flood discharge sand hole of a water conservancy project,the scour of the down-stream riverbed in the energy dissipation area was simulated by using the method of moving bed model test,and the optimization ideas and modification schemes were put forward according to the scour under different flood discharge conditions.Through the test results,it can be concluded that the scour depth and the shape of the downstream riverbed under various conditions,the lowest point of the scour pit is on the axis of the retreat channel,the maximum scour pit depth can reach 3.84m under the checking condition,and the scour pit depth of the end of the reinforced stone cage is 1.38m.Therefore,the depth of the anti-scouring teeth wall at the end of the retreat channel should be no less than 2m to ensure the safety of the retreat channel and the relieving pool.

Flood discharge and sand flushing tunnelHydraulic model testScour depth

罗昌辉

展开 >

新疆水利水电勘测设计研究院有限责任公司,新疆 乌鲁木齐 830000

泄洪冲沙洞 水工模型试验 冲刷深度

2025

吉林水利
吉林省水利宣传中心

吉林水利

影响因子:0.338
ISSN:1009-2846
年,卷(期):2025.(1)