首页|浅析工程总承包模式下的建设投资控制

浅析工程总承包模式下的建设投资控制

扫码查看
目前建筑行业处在下行阶段,工程项目不断收紧,但是随着一系列工程总承包政策的密集出台,工程总承包业务在政策驱动、市场需求和企业实践推动下逆势增长,工程总承包模式下,不同阶段项目投资控制的方向、方式和方法也有了新的呈现,文章基于建设单位和工程总承包单位不同视角下浅析工程总承包项目投资控制.
A Comprehensive Examination of Construction Investment Control within the Engineering General Contracting Framework
While the construction industry faces a downturn and projects become more stringent,the engineering general contracting sector is defying the odds through the implementation of policies,market demands,and enterprise strategies.Within the engineering general contracting model,the directions,methods,and approaches for project investment control have evolved significantly at various stages.This study offers a concise analysis of project investment control under the engineering general contracting model,focusing on the perspectives of both the construction unit and the engineering general contracting unit.

engineering general contractingconstruction investmentstage divisiondesign managementmatrix management

莫笑凡

展开 >

甘肃省建筑设计研究院有限公司,兰州 730030

工程总承包 建设投资 阶段划分 设计管理 矩阵管理

2024

建筑设计管理
中国建筑东北设计研究院有限公司 中国勘察设计协会

建筑设计管理

影响因子:0.923
ISSN:1673-1093
年,卷(期):2024.41(8)