From the"Old"Factory Building Transformation Activation to the"New"Scientific Research High Precision Process Laboratory
The design and planning of scientific research laboratory,whether new construction,expansion or reconstruction project,is a complex system engineering;It is not only the overall planning,reasonable layout and graphic design of the laboratory,but also the basic conditions of power supply,water supply,gas supply,ventilation,air purification,waste removal,environmental protection(such as involving nuclides,X-rays,etc.);At the same time,the basic demand of laboratory equipment,electricity demand of scientific research equipment,clean room demand,transportation channel,decoration and so on are also closely related.By light sleeper major scientific research project transition site construction engineering practice,this paper expounds the light research laboratories in the process of project construction from the"old"building activation to the"new"in technological laboratory research and high precision demand"person"and"content"of the experimental environment and the technical measures of demand,to provide experience for the construction of similar domestic old lab instead.
activate the dimensionthe needs of peoplethe demand for thingsURS requirementsprocess designthe micro vibration