首页|基于POI的TOD项目设计策略研究

基于POI的TOD项目设计策略研究

扫码查看
POI是"Point of Interest"的缩写.每个POI包含四方面信息,名称、类别、坐标、分类,文章拟通过对地面空间和地下空间两个维度的用地构成、建筑类型与使用功能的研究分析,尝试探索基于POI的旧城核心区地铁站出入口设置的量化设计方法.文章通过文献研读、类比分析等研究手段,对国内外地铁站出入口设置进行了梳理与分析,弥补了旧城核心区地铁站出入口量化设置研究的理论空白,为国内类似项目提供了一定的设计研究素材.
Research on Design Strategy of TOD Project based on POI
POI is the abbreviation of"Point of Interest".Each POI contains four aspects of information:name,category,coordinates and classification.Based on the analysis of land use composition,building type and function of ground space and underground space,combined with POI data of different types in the research scope,this paper tries to explore the quantitative design method of the entrance and exit of the metro station in the core area of the city.Through literature study,analogy analysis and other research methods,this paper makes a comprehensive analysis of the subway station entrance and exit settings at home and abroad,which makes up for the theoretical blank of the quantitative setting of subway station entrance and exit in the core area of the old city,and provides certain design and research materials for similar projects in China.

POIunderground spaceentrance and exit of subway stationTOD

王楠、梅振宇

展开 >

浙江大学

浙江大学建工学院

POI 地下空间 地铁站出入口 TOD

2024

建筑与文化
世纪图书出版公司

建筑与文化

影响因子:0.173
ISSN:1672-4909
年,卷(期):2024.(9)
  • 3