本文依托武汉地铁12号线中一路站基坑工程,采用Plaxis3D有限元软件建立数值模型,研究不同施工阶段地连墙水平位移、地表沉降和地连墙与立柱差异沉降的影响及变化规律;与明挖法相比,采用主体结构多次分段浇筑并架设内支撑方法对原方案进行优化分析.结果表明:随着基坑的开挖,地连墙水平位移和地表沉降逐渐增大,而地连墙与立柱的差异沉降呈现波动变化;与明挖法进行对比,盖挖法可有效控制基坑变形和降低对周边环境的影响;随着分段浇筑的层数和支撑道数的增加,基坑变形有减小的趋势,地连墙与立柱的差异沉降依旧呈现波动变化,当每个楼板间分3层浇筑且中间架设两道撑时,地连墙最大水平位移可减少22.47%左右,最大地表沉降可减少19.01%左右,本文得到的结论可为类似工程的设计和施工提供参考.
Influence of Foundation Pit Construction of Subway with Cover Excavation on the Differential Settlement of Envelope Structure and Lattice Column
Based on the foundation pit project of Zhongyi road station of Wuhan metro line 12,this paper uses Plaxis3D finite element software to establish a numerical model,and studies the influence and deformation rules of the horizontal displacement,surface settlement and differential settlement of the ground wall and lattice column in different construction stages.Compared with the open excavation method,the construction scheme of the main structure with multiple sections pouring and setting up the inner support is optimized and analyzed.The results show that with the excavation of foundation pit,the horizontal displacement and ground settlement increase gradually,while the differential settlement between ground wall and lattice column fluctuates.Compared with open excavation method,cover excavation method is better in controlling the deformation of foundation pit and reducing the disturbance to the surrounding environment.With the increase of the number of layers and the number of supporting channels,the deformation of foundation pit shows a gradually decreasing trend,and the differential settlement between ground connecting wall and lattice column still shows fluctuations.When each floor slab is poured in two layers and a support is installed in the middle,the maximum horizontal displacement of ground connecting wall can be reduced by 22.47%,and the maximum surface settlement can be reduced by 19.01%.Considering engineering deformation and economy comprehensively,the second project is the best choice for this project.The conclusions in this paper can provide basis and reference for design and construction,and provide reference for similar projects.

foundation pit engineeringcover excavation methodnumerical simulationdeformation optimization analysis

王凯、吴勇、丁海滨、唐晓林、刘志云

展开 >

中交第二公路勘察设计研究院有限公司,武汉 430056

中交集团隧道与地下空间工程技术研发中心,武汉 430056

中交城市轨道交通设计研究院有限公司,武汉 430056

华东交通大学 江西省岩土工程基础设施安全与控制重点实验室,南昌 330013

展开 >

基坑工程 盖挖法 数值模拟 变形优化分析

江西省自然科学基金-揭榜挂帅项目