科学技术与工程2024,Vol.24Issue(2) :748-756.DOI:10.12404/j.issn.1671-1815.2301410

基于序贯高斯模拟法的水利工程坝址区速度建模

Velocity Modeling of Hydraulic Engineering Dam Site Based on Sequential Gaussian

李伟 周怀来 刘兴业 王元君 马慧莲
科学技术与工程2024,Vol.24Issue(2) :748-756.DOI:10.12404/j.issn.1671-1815.2301410

基于序贯高斯模拟法的水利工程坝址区速度建模

Velocity Modeling of Hydraulic Engineering Dam Site Based on Sequential Gaussian

李伟 1周怀来 1刘兴业 1王元君 1马慧莲2
扫码查看

作者信息

  • 1. 成都理工大学地球物理学院,成都 610059;成都理工大学地球勘探与信息技术教育部重点实验室, 成都 610059
  • 2. 成都理工大学地球物理学院,成都 610059
  • 折叠

摘要

水利工程坝址的选取不仅关系着安全性,也影响着后期的投入使用以及稳定运行.通常坝址区选择需要对区域的速度和岩性进行分析,其中高精度的速度建模至关重要.针对水利坝址选取,提出了一种地震信息约束的地质统计学建模方法对坝址区进行高精度速度建模,在此基础上分析坝址选取的安全性及合理性.通过地质统计学理论,分析坝址区速度的区域变异性,利用地震层位的横向信息以及测井资料的纵向信息联合进行序贯高斯模拟,从而建立速度模型,建模结果更加符合实际情况,能有效反映速度的空间分布情况.最后通过建立的速度模型合成地震记录,与实际地震记录相对比,吻合程度较高,表明建立的模型能反映坝址区的速度分布情况,能基于此圈定出有利于修建坝址的区域,验证了方法的可行性.

Abstract

The selection of dam site of water conservancy project is not only related to safety,but also affects the later use and sta-ble operation.The analysis of regional velocity and lithology is usually required in the process of selection,where high-precision veloci-ty modeling is critical.Aiming at the selection of water conservancy dam site,a kind of geostatistical modeling method constrained by seismic information was proposed to model the high-precision velocity of dam site area.On this basis,the safety and rationality of dam site selection were analyzed.Through the theory of geostatistics,the regional variability of velocity in dam site area was analyzed,and the sequential gaussian simulation was carried out by using the lateral information of seismic horizon and the longitudinal information of logging data,then the velocity model was established.The modeling results were more in line with the actual situation and can effec-tively reflect the spatial distribution of velocity.Finally,the seismic records were synthesized by the established velocity model,which was in good agreement with the actual seismic records.The results show that the established model can reflect the velocity distribution of the dam site area,and the area conducive to the construction of the dam site can be delineated based on method of this paper,which verifies the feasibility of this method.

关键词

水利坝址区/速度建模/地质统计学/序贯高斯模拟/地震约束

Key words

hydraulic engineering dam site/velocity modeling/geostatistics/sequential Gaussian simulation/seismic constraints

引用本文复制引用

基金项目

四川省自然科学基金(2022NSFSC1150)

四川省科技计划(2021YFG0257)

四川省科技计划(2021YFH0050)

出版年

2024
科学技术与工程
中国技术经济学会

科学技术与工程

CSTPCD北大核心
影响因子:0.338
ISSN:1671-1815
参考文献量16
段落导航相关论文