为解决大规模新能源接入导致传统电网中常规机组调节压力不断增大的问题,提出了一种考虑储能和多种工业负荷参与的多时间尺度优化调度策略.该策略通过协调荷侧电解铝、水泥、钢铁、非生产性负荷与储能以及源侧常规机组调用计划,有效缓解电网调节压力.首先,分析储能和多种工业负荷的调节特性,建立风-光-荷-储的滚动调节框架.然后,针对源荷不确定性,采用多场景随机规划与模糊机会约束目标规划相结合的方法,建立日前和日内阶段以系统经济性最优为 目标、实时调度阶段兼顾安全性和经济性的多时间尺度调度模型.最后,通过新能源充足与不足典型日算例可知,本文所提调度策略能够充分发挥可调控资源的调节能力,在两种典型日的总成本较日前最优调度分别降低了 17.08%、44.13%,弃新能源量降低39%、失负荷量降低23%,有效提高了电网运行经济性和安全性.
Optimal Scheduling of Source-Load-Storage at Multiple Time Scales Considering the Participation of Multiple Industrial Loads
In order to solve the problem of increasing regulation pressure of conventional units in traditional power grid caused by large-scale new energy access,a multi-time scale optimal dispatching strategy considering energy storage and multi-industrial load participation was proposed.This strategy can effectively relieve the pressure of power grid regulation by coordinating electrolytic aluminum,cement,steel,unproductive load and energy storage on the load side and conventional unit calling plan on the source side.Firstly,the regulation characteristics of energy storage and various industrial loads were analyzed,and a rolling regulation framework of wind-light-load-storage was established.Secondly,aiming at the source load uncertainty,the multi-scenario stochastic programming combined with fuzzy chance constrained goal programming was adopted to establish a multi-time scale scheduling model,which aimed at the optimal system economy in the day-ahead and day-ahead stages,and took into account both security and economy in the real-time scheduling stage.Finally,through the typical days of sufficient and insufficient new energy,it can be seen that the scheduling strategy can give full play to the adjustment ability of controllable resources.The total cost on the two typical days was reduced by 17.08%and 44.13%respectively compared with the previous optimal scheduling,the amount of abandoned new energy was reduced by 39%,and the amount of lost load by 23%,which effectively improved the safety and economy of power grid operation.

industrial loadsenergy storagemultiple time scalesmulti-scenario stochastic programmingfuzzy chance-constrained goal programming

王小庆、王海云、范添圆、闫斯哲、郑红娟

展开 >

新疆大学可再生能源发电与并网控制教育部工程研究中心,乌鲁木齐 830047

浙江大学电气工程学院,杭州 310027

国电南瑞科技股份有限公司,南京 211106

工业负荷 储能 多时间尺度 多场景随机规划 模糊机会约束目标规划