科学技术与工程2024,Vol.24Issue(22) :9616-9625.DOI:10.12404/j.issn.1671-1815.2305995

阜溧高速软基区现浇混凝土曲线梁线形控制

Alignment Control of Cast-in-situ Concrete Curved Beams in Soft Foundation Area of Fuli Expressway

杨立 谷亚陆 汪明 梁斌
科学技术与工程2024,Vol.24Issue(22) :9616-9625.DOI:10.12404/j.issn.1671-1815.2305995

阜溧高速软基区现浇混凝土曲线梁线形控制

Alignment Control of Cast-in-situ Concrete Curved Beams in Soft Foundation Area of Fuli Expressway

杨立 1谷亚陆 2汪明 3梁斌2
扫码查看

作者信息

  • 1. 中铁十五局集团第五工程有限公司,天津 300133;河南科技大学土木建筑学院,洛阳 471000
  • 2. 河南科技大学土木建筑学院,洛阳 471000
  • 3. 中铁十五局集团第五工程有限公司,天津 300133
  • 折叠

摘要

软基区域的现浇混凝土曲线梁在施工时面临着地基承载力弱、不可控因素多、成桥线形控制难度大等问题.以阜溧高速公路大纵湖互通C匝道桥现浇混凝土曲线梁工程为依托,提出了桥梁施工区域软基的加固措施,采用有限元软件Midas Civil建立了曲线梁模型,分析了曲线梁竖向和径向位移的变化规律和影响因素,提出了曲线梁线形控制的施工措施.结果表明:收缩徐变、预应力、恒载引起的预应力连续箱梁最大挠度值分别为2、13、12.5 mm,在混凝土弹性模量、容重和预应力改变时,预应力改变对挠度影响最大;曲线梁平面径向位移对温度作用较敏感,系统升温引起的径向位移达到了 14.11 mm.对箱梁开展监测,结果表明该混凝土箱梁高程偏差满足规范要求,且监测结果与有限元模拟值较吻合,研究结果可为类似工程提供借鉴.

Abstract

The construction of cast-in-place concrete curved beams in the soft foundation area faces problems such as weak founda-tion bearing capacity,many uncontrollable factors,and difficulty in controlling the alignment of the bridge.Relying on the cast-in-place concrete curve beam project of the Dazong Lake Interchange C ramp bridge of Fuli Expressway,the reinforcement measures for the soft foundation in the bridge construction area were proposed.The curved beam model was established through the finite element software Midas Civil,the changing rules and influencing factors of the vertical and radial displacements of the curved beam were ana-lyzed,and construction measures for linear control of curved beams were proposed.The results show that the maximum deflection of prestressed continuous box girder caused by shrinkage creep,prestress and dead load is 2 mm,13 mm and 12.5 mm respectively,the change in prestress has the greatest influence.The plane radial displacement of the curved beam is more sensitive to the temperature effect,and the radial displacement caused by the system temperature rise reaches 14.11 mm.The monitoring of the box girder shows that the elevation deviation of the concrete box girder meets the specification requirements,and the monitoring results are in good agree-ment with the finite element simulation values.The research results can provide reference for similar projects.

关键词

高速公路/软基区/现浇混凝土曲线梁/线形控制/有限元模拟/现场监测

Key words

expressway/soft base area/cast-in-place concrete curved beam/line control/finite element simulation/on-site moni-toring

引用本文复制引用

基金项目

国家自然科学基金(U1604135)

中铁十五局集团有限公司B类科研课题(2021B04)

河南省科技厅产学研合作项目(2015HNCXY011)

出版年

2024
科学技术与工程
中国技术经济学会

科学技术与工程

CSTPCD北大核心
影响因子:0.338
ISSN:1671-1815
段落导航相关论文