科学技术与工程2024,Vol.24Issue(33) :14483-14490.DOI:10.12404/j.issn.1671-1815.2401401

海上稠油火驱固井系统第一界面完整性分析

Integrity Analysis of the First Interface of Offshore Heavy Oil Fire Flooding Cementing System

王名春 马书慧 岳家平 武胜男 张来斌 王奕辰
科学技术与工程2024,Vol.24Issue(33) :14483-14490.DOI:10.12404/j.issn.1671-1815.2401401

海上稠油火驱固井系统第一界面完整性分析

Integrity Analysis of the First Interface of Offshore Heavy Oil Fire Flooding Cementing System

王名春 1马书慧 2岳家平 3武胜男 2张来斌 2王奕辰3
扫码查看

作者信息

  • 1. 中国石油大学(北京)安全与海洋工程学院,北京 102249;中海油研究总院有限责任公司,北京 100028
  • 2. 中国石油大学(北京)安全与海洋工程学院,北京 102249
  • 3. 中海油研究总院有限责任公司,北京 100028
  • 折叠

摘要

海上稠油油藏丰富,开采前景广阔.但火驱开采环境恶劣,难以保障安全开采.为研究固井系统的完整性,基于Mohr-Coulomb准则、力学理论和温度场分布,计算固井第一界面微环隙.考虑非均匀地应力、井下高温和地层温度共同作用对套管-水泥环-地层组合系统的影响,获取第一界面微环隙分布图.结果表明:井下温度、水泥环弹性模量、水泥环泊松比、水泥环热膨胀系数以及水泥环导热系数对固井第一界面的微环隙均有影响,通过调整水泥石的参数可以提高固井设备的安全性.

Abstract

Offshore heavy oil reservoirs are abundant,with broad development prospects.However,the environment of fire flooding is harsh,so it is difficult to ensure safe exploitation.In order to study the integrity of cementing system,based on the Mohr-Coulomb criterion,mechanical theory and temperature field distribution,the first interface micro-annular of cementing was calculated.Consider-ing the effects of non-uniform in-situ stress,downhole high temperature,and formation temperature on the casing-cement ring-formation combination system,and obtain the distribution diagram of the first interface micro-annulus.The results show that downhole tempera-ture,elastic modulus of cement ring,Poisson's ratio of cement ring,thermal expansion coefficient of cement ring,and thermal conduc-tivity of cement ring all have an impact on the first interface micro-annular of cementing,and the safety of cementing device can be im-proved by adjusting the parameters of cement stone.

关键词

稠油火驱/高温/套管-水泥环-地层/完整性/微环隙

Key words

heavy oil fire flooding/high temperature/casing-cement ring-formation/integrity/micro-annular

引用本文复制引用

出版年

2024
科学技术与工程
中国技术经济学会

科学技术与工程

CSTPCD北大核心
影响因子:0.338
ISSN:1671-1815
段落导航相关论文