首页|煤矿钻孔成缝切顶卸压技术

煤矿钻孔成缝切顶卸压技术

扫码查看
切顶卸压技术作为一种被广泛认可的有效巷道支护手段,在改善巷道内的应力分布和减轻围岩变形方面发挥着积极作用.为解决西川煤矿1123运输巷道所面临的应力问题,以及减少围岩变形的需求,提出了钻孔成缝切顶卸压技术.此技术能把钻孔深入到高压带,卸压效果好且灵活可靠,适用于煤层中较为坚硬的岩石,具有较高的可靠性和实用性.通过应力函数法的精确计算,确定了适用于该煤矿的钻孔的上下阈值,分别为14.14和6.32,通过数值仿真软件对不同孔间距下的顶板垮落状态进行深入分析,研究切顶前后实体煤的应力分布规律.结果表明:切顶卸压技术显著改善了顶板的冒落性,可有效地预防冲击地压的发生;同时该技术能够有效地降低应力转移比例,使实体煤中应力峰值下降25.44%,峰值点内推179.18%.研究结果可为后续小煤柱留设和支护方式的选择提供参考.
Drilling into joint and top-cutting pressure relief technology for a coal mine
As a widely recognized and effective roadway support method,the top-cutting pressure relief technology,plays a positive role in improving the stress distribution inside the roadway and reducing the deformation of surrounding rock.To address the stress issues faced by the 1123 transportation roadway in Xichuan Coal Mine and reduce the deformation of surrounding rock,a drilling into joint and top-cutting pressure relief technology has been proposed.This technology can drill deeply into high-pressure zones,has a good pressure relief effect,and is flexible reliable,which is suitable for harder rocks in coal seams,and has high reliability and practicality.Through precise calculations using the stress function method,the upper and lower thresholds suitable for the drilling of the coal mine were determined,which are 14.14 and 6.32,respectively.The collapse state of the roof under different hole spacing was analyzed in depth using the numerical simulation method,and the stress distribution properties of solid coal before and after roof cutting were studied.The results show that the top cutting and pressure relief technology significantly improves the roof caving performance and can effectively prevent the occurrence of rockburst.At the same time,this technology can effectively reduce the stress transfer ratio,reducing the peak stress values in solid coal by 25.44%and pushing the peak point inward by 179.18%.The research results can providea reference for the selection of small coal pillar retention and support methods in the future.

coal minedrilling into jointtop-cutting pressure reliefstress function methodstress distributionnumerical simulation

刘博、张磊、宜伟、汪义龙、胡涛、耿华乐、刘成波、黄旭

展开 >

华能铜川照金煤电有限公司西川煤矿分公司,陕西铜川 727102

华能煤炭技术研究有限公司,北京 100070

华能煤业有限公司,北京 100070

安徽理工大学土木建筑学院,安徽淮南 232001

展开 >

煤矿 钻孔 切顶卸压 应力函数法 应力分布 数值模拟

安徽省高等学校自然科学研究重点项目

KJ2019A0099

2024

矿冶
北京矿冶研究总院

矿冶

CSTPCD
影响因子:0.78
ISSN:1005-7854
年,卷(期):2024.33(4)