首页|深基坑工程顺逆作法施工技术及变形位移监测

深基坑工程顺逆作法施工技术及变形位移监测

扫码查看
顺逆作法施工融合了顺作法和逆作法的优势,更适合深大基坑工程项目。采用文献资料法、案例法等研究方法,以某高层建筑为例,探究深基坑工程中顺逆作法施工技术的应用。研究结果表明,深基坑能够加快施工进度、降低施工难度、削弱对周边环境的影响。在高层建筑深基坑工程中应用顺逆作法可以实现质量、环保、经济、效率、安全的全方位兼顾,有着广阔的应用前景。
Construction Technology and Deformation and Displacement Monitoring in Deep Foundation Pit by Forward-reverse Construction Method
The forward-reverse construction method combines the advantages of the forward construction me-thod and the reverse construction method,which is more suitable for deep and large foundation pit projects.Taking some high-rise building as an example,this paper uses of literature method and case study to explore the applica-tion of the construction technology in deep foundation pits by the forward-reverse construction method.The results show that the deep foundation pit can speed up the construction schedule,reduce the construction difficulty and weaken the impact on the surrounding environment.The application of the forward-reverse construction method in deep foundation pit of high-rise buildings can achieve all-round consideration of the quality,environmental protec-tion,economy,efficiency and safety,and has a broad application prospect.

high-rise buildingdeep foundation pitthe forward-reverse construction methoddisplacement monitoring

霍军

展开 >

商丘职业技术学院,河南 商丘 476000

高层建筑 深基坑 顺逆作法 位移监测

河南省职业教育精品在线开放课程建设项目(2023)中国高校产学研创新基金北创助教项目(第三期)(2022)河南省兴文化工程文化研究专项(2022)

1242022BC0572022XWH089

2024

漯河职业技术学院学报
漯河职业技术学院

漯河职业技术学院学报

影响因子:0.219
ISSN:1671-7864
年,卷(期):2024.23(2)
  • 5