Construction Technology of Large Glass Reinforced Plastic(FRP)Double-pipe Water Supply Pipeline Crossing Riverbank Swamp Section in Angola
Angola SOYO Ⅰ combined cycle power station water intake FRP pipe through the swampy section of Congo River bank,FRP pipe double pipe arrangement,pipe diameter D=600 mm,pipe section length of 6 m,pipe section using double"O"type integral socket connection,pipe and equipment,valves using flange connection.The installation method of FRP pipe under special and complex geological conditions is improved.Through the reasonable selection of water intake pipe,the optimal pipeline treatent scheme is determined.By strictly hydraulic testing and the ensured measures of the installation quality of glass steel pipes,the quality of the project has been effectively guaranteed.
large pipelinesglass reinforced plastic pipesparallel crossingriver marsheshydraulic testingmedium coarse sand replacementsilt squeezed by rubble