Angola SOYO Ⅰ combined cycle power station water intake FRP pipe through the swampy section of Congo River bank,FRP pipe double pipe arrangement,pipe diameter D=600 mm,pipe section length of 6 m,pipe section using double"O"type integral socket connection,pipe and equipment,valves using flange connection.The installation method of FRP pipe under special and complex geological conditions is improved.Through the reasonable selection of water intake pipe,the optimal pipeline treatent scheme is determined.By strictly hydraulic testing and the ensured measures of the installation quality of glass steel pipes,the quality of the project has been effectively guaranteed.
关键词
长大管道/玻璃钢管/并排穿越/河滩沼泽/水压试验/中粗砂换填/毛石挤淤
Key words
large pipelines/glass reinforced plastic pipes/parallel crossing/river marshes/hydraulic testing/medium coarse sand replacement/silt squeezed by rubble