In order to adapt to the timeliness and safety of emergency lanslide rescue projects,a design cycle,computing method and specific parameter values were proposed,and it is also applied to a landslide remediation project induced during the construction of a railway near the road.Reasonable calculation results were obtained.Combined with the monitoring measurement and numerical simulation analysis,it was verified that this design method is feasible in rescue projects.The engineering results show that the calculation method and the specific parameters are reasonable.
关键词
工程滑坡/抢险整治措施/小口径组合桩/设计方法/参数取值
Key words
engineering landslide/emergency rescue and rectification measures/small diameter composite pile/design method/parameter value