以广州综合管廊盾构区间下穿珠江及大坦沙岛房屋群项目为研究对象,通过施工前准备、试验段初拟施工参数,对穿越段针对性地实施施工组织和技术措施,总结出盾构区间下穿河流和房屋集群的施工方法,顺利完成了施工任务.

Abstract

Taking the housing cluster projects of Guangzhou integrated pipe rack shield section underpassing the Pearl River and the Datansha Island as the research object,the targeted construction organization and technical measures of the crossing section are carried out through the preparation before construction and the preliminary construction parameters of the test section,and the construction methods of the shield section underpassing the river and the housing cluster are summarized,and the construction tasks are successfully completed.

关键词

老旧城区/泥质粉砂岩/地铁盾构/下穿河流/房屋集群/监控量测/注浆加固/风险控制

Key words

old town/muddy siltstone/metro shield/underpassing river/housing cluster/monitoring measurement/grouting reinforcement/risk control