Treatment Technology for Stuck Machine in Double Shield TBM Construction in Weak Surrounding Rock
Restricted by the characteristics of its own construction method,stuck machine in different degrees after encountering bad geology in practical application will occur in the double shield TBM.Taking the construction of diversion tunnel in a country of South Asia as an example,this paper introduces and analyzes the treatment of double-shield TBM stuck in weak surrounding rock,and puts forward the methods and measures for the treatment of stuck TBM.