余吾煤业选煤厂扩能方案研究
Research on capacity expansion scheme in Yuwu Coal preparation plant
马素芳1
作者信息
- 1. 潞安化工集团余吾煤业公司,山西长治 046000
- 折叠
摘要
为保证余吾矿井的持续稳产高产,实现喷吹煤扩产效益最大化,同时解决潞安180项目用煤需求,提出建设3.00 Mt/a扩能洗选系统,从煤源、市场需求、扩能技术方案的可行性等方面,对系统建设进行了分析论证.
Abstract
In order to ensure the continuous and stable production and high yield of Yuwu Mine,maximize the efficiency of coal injection expansion,and solve the coal demand of Lu'an 180 project,the construction of 3.00Mt/a capacity expansion washing system is proposed.The system construction is analyzed and demonstrated from the aspects of coal source,market demand and feasibility of capacity expansion technical program.
关键词
选煤厂/洗选系统/工艺流程/扩能/方案论证Key words
coal preparation plant/washing system/process flow/capacity expansion/scheme demonstration引用本文复制引用