Problems and improvements of coal slime water system in Ruisheng Coal Preparation Plant
Some problems appeared in the production of Ruisheng Coal preparation plant.Such as,the poor sorting effect of coarse slime,the overload of coarse slime pump motor and the high moisture of coal slime centrifuge products.Aiming at these problems,the cause of the problem was found out through comprehensive analysis.And corresponding improvement measures were taken to realize the normal operation of the coal preparation plant.
coal preparation plantcoarse slime sortingspiral sorting machineslime water systemmoisture of cleaned coal