分析了中煤塔山选煤厂工艺系统生产中存在的问题,并对生产故障率高的关键设备进行深刻分析;提出设备改进+系统优化相结合的改造方法,对关键性单机设备的工作原理和机械结构进行了优化,单机设备万吨故障率降低 75%,提高了选煤厂的入洗能力和劳动效率,取得了良好的经济效益.
Process technology reformation practice of China Coal Datong Energy Tashan Coal Preparation Plant
This paper analyzes the problems existing in the production process system of Tashan Coal preparation Plant of China Coal,and deeply analyzes the reasons for the key equipment with high production failure rate.The combination of equipment improvement and system optimization is put forward to optimize the working principle and mechanical structure of key single equipment.The failure rate of single equipment is reduced by 75%,the washing capacity and labor efficiency of coal preparation plant are improved,and good economic benefits are obtained.

coal preparation plantequipment improvementsystem optimizationequipment failure rate

张旭东

展开 >

中煤大同能源有限责任公司,山西 大同 030071

选煤厂 设备改进 系统优化 设备故障率

2024

煤炭加工与综合利用
中国煤炭加工利用协会

煤炭加工与综合利用

影响因子:0.496
ISSN:1005-8397
年,卷(期):2024.(12)